Sunday 13 March 2016

Ullswater Yacht Club 

Its been a very busy week at Ullswater Yacht Club this week as the work has started to install new supplies to the temporary building after storm Desmond destroyed the club house in December 2015 under 6 feet of water the lake was 12.5 feet above normal level during storm Desmond.

Arran Installing Supply to Bar & Training Room


Damage behind Bar after water had gone down 4ft 



The Club house is beyond repair the only part of the club house which will be used this season is the Changing Rooms, Toilets and Showers Currently Roland Hills team are working hard to re plaster,tile the areas before the 19th March when the club is open for business.

Disabled Toilet was under 6ft of water 
Temporary bar now sited on the right of club

No comments:

Post a Comment